2023-07-17
Operation Department
Date: July 2023
Location: Changsha City, Hunan Province
Project Name: Expansion and Reconstruction Project of the Main Sewage Pipe in the South of Changsha Economic and Technological Development Zone
Project type: Sewage Pipe Network Project
Equipment: Tangxing Equipment HRC 1800mm hard rock pipe jacking machine
Geology: Argillaceous siltstone
Jacking Distance: Divided into 4 jacking sections, the total jacking distance is over 400 meters
Significance: The project is located in Changsha Economic and Technological Development Zone, on the north side of Lijiang Port. As the water inlet supervisor of Chengnan Sewage Treatment Plant, it belongs to the pollution receiving scope of Chengnan Sewage Treatment Plant. After the completion of the project, it will improve the local sewage treatment capacity and play a positive role in improving the quality of the surrounding water environment.
![]() |
![]() |
Successful Launch of Pipe Jacking Between Shaft No. 8 and Shaft No. 7 of the Huanbei Guangdong Project (Section D4)
The 1,148-meter Pipe Jacking Section of the Foshan Xuda Power Tunnel Project Has Been Successfully Completed
"Huanbei Guangxi No. 8 (Shield Tunneling)" Hard Rock Shield TBM Successfully Launched







sales@tangxing.cn
086-5542796608