Location: Shijiazhuang City, Hebei Province
Project Name: Oil Pipeline Project (Crossing the South-to-North Water Diversion Project)
Project Type: Oil Pipeline Network Project
Equipment: Tangxing Equipment HRC 1800mm hard rock pipe jacking machine
Geology: Pebble
Jacking Distance: 220 meters
Difficulties: Rich groundwater, 32 meters of soil cover, and pipe jacking across the river. In the early stage of the project, the pipe jacking machine failed due to the use of equipment from other companies. Later, the Tangxing pipe jacking machine was used for rescue.
Significance: The completion of the project marks Tangxing Equipment's high-quality products and advanced hard rock excavation technology. After the project is completed, it will be of great significance to effectively promote regional economic development and ensure energy supply.
![]() |
![]() |
![]() |
![]() |
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
A Perfect Breakthrough for the First Jacking Section of Ulaanbaatar Water Diversion Project Section in Mongolia
A Perfect Breakthrough for the First Section of Sewage Pipe Network in Moscow, Russia
sales@tangxing.cn
086-5542796608