1. The TBM adopts belt conveyor mucking system, and there is no need to lay pipe segments, so it can excavate automaticly in full face rock formations.
2. Tailored features such as the TBM heavy-duty cutter head, multi-section shield, three-dimensional mucking system, and variable support system were strategically incorporated to fulfill the demands of efficient and extended hard rock excavation.
3. The TBM adopts centralized control on the ground or local control in the machine, with automatic calculation and analysis functions. It can realize remote management, and has a high degree of automation.
|  | 
 | 
The Tunnel Project of the Qinshan Nuclear Power Auxiliary Steam Networking Project
The tunnel for this project spans over 1,000 meters, traversing tuff formations, with rock hardness ranging from 30 to 80 MPa;
The TBM is equipped with heavy-duty cutter head, multi-section shield, three-dimensional mucking system and variable support system.
 
 



 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
  
 
 