TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2023-09-25
Operation Department
Date: September 2023
Location: Malaysia
Project Name: The Second Phase of the Kuching Sewage Treatment System in East Malaysia
Project Type: Sewage pipe network project
Equipment Details: Tangxing Technology HRC 1500mm hard rock pipe jacking machine
Geology: Hard rock, rock hardness up to 100 to 130 MPa
Jacking Distance: 240 meters
Difficulties: The working shaft is 35 meters deep with abundant groundwater. It has difficulties such as large soil depth, high rock hardness, and a large wear coefficient, which requires high wear resistance of the cutter head.
Significance: The completion of The Second Phase of the Kuching Sewage Treatment System in East Malaysia will effectively ease the lives of residents in the jurisdiction and solve problems such as pollution caused by sewage flowing into rivers.
![]() |
![]() |
![]() |
![]() |
“Rongyuan” Hard Rock Jacking and Tunnelling Machine Successfully Launched
A Perfect Breakthrough for "Zhoushui" TBM
Tangxing Technology HRC2800mm Rock Pipe Jacking Machine Successfully Completes Key Section of Foshan Cable Duct Project
sales@tangxing.cn
086-5542796608