2022-04-22
operation department
Date: April 2020
Project Name: Rongjiang New District Sewage Project
Location: Rongjiang New District, Ganzhou City, Jiangxi Province
Equipment: 1000 rock MTBM
Geology: moderately weathered argillaceous siltstone
Pipe material: 1000mm steel pipe
Difficulties: double-row pipe jacking, single jacking distance is about 400 meters, and the pipe jacking across the river
![]() |
![]() |
![]() |
![]() |
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
Successful Breakthrough of the Second Water Treatment Plant Relocation Project (First Section) in Wanan County, Jiangxi
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering