TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2022-04-22
operation department
Date: April 2018
Project Name: Sanshan Lake to Yanglan Lake Ecological Water Supplement Project
Location: Ezhou City, Hubei Province
Equipment: 2000 rock MTBM
Geology: Strongly weathered rock, silty clay, moderately weathered rock, quartz sandstone, silt
Pipe Material: 2400mm steel pipe
The Longest Jacking Distance: 903 meters
Difficulties: rich geological changes, high requirements for equipment adaptability, and continuous changes in construction methods
![]() |
![]() |
"Huanbei Guangxi No. 8 (Shield Tunneling)" Hard Rock Shield TBM Successfully Launched
Jinan Metropolitan Circle Expressway West Ring Pipe Jacking Project Successfully Launched
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
sales@tangxing.cn
086-5542796608