Date: April 2018
Project Name: Sanshan Lake to Yanglan Lake Ecological Water Supplement Project
Location: Ezhou City, Hubei Province
Equipment: 2000 rock MTBM
Geology: Strongly weathered rock, silty clay, moderately weathered rock, quartz sandstone, silt
Pipe Material: 2400mm steel pipe
The Longest Jacking Distance: 903 meters
Difficulties: rich geological changes, high requirements for equipment adaptability, and continuous changes in construction methods
![]() |
![]() |