TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2022-04-22
operation department
Date: April 2018
Project Name: Sanshan Lake to Yanglan Lake Ecological Water Supplement Project
Location: Ezhou City, Hubei Province
Equipment: 2000 rock MTBM
Geology: Strongly weathered rock, silty clay, moderately weathered rock, quartz sandstone, silt
Pipe Material: 2400mm steel pipe
The Longest Jacking Distance: 903 meters
Difficulties: rich geological changes, high requirements for equipment adaptability, and continuous changes in construction methods
![]() |
![]() |
“Rongyuan” Hard Rock Jacking and Tunnelling Machine Successfully Launched
A Perfect Breakthrough for "Zhoushui" TBM
Tangxing Technology HRC2800mm Rock Pipe Jacking Machine Successfully Completes Key Section of Foshan Cable Duct Project
sales@tangxing.cn
086-5542796608