TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2025-05-16
Operation Department
Date: April 2025
Construction location: Ningbo City, Zhejiang Province
Project Name: Xidian Binhaixi River box culvert jacking project across Shenhai Expressway
Project Type: Expressway box culvert jacking project
Equipment Details: Tangxing Technology RPB 6900*4200mm rectangular pipe jacking machine
Single jacking distance: 40 meters
Geology: Pebble, solitary rocks and floating stones crossing the expressway
Project Difficulties: Complex geological conditions and high construction difficulty
![]() |
![]() |
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
A Perfect Breakthrough for the First Jacking Section of Ulaanbaatar Water Diversion Project Section in Mongolia
sales@tangxing.cn
086-5542796608