2025-05-16
Operation Department
Date: May 2025
Construction Location: Jinan City, Shandong Province
Project Name: Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
Project Type: Heating pipeline engineering
Equipment Details: Tangxing Technology HRC2600 rock pipe jacking machine
Jacking Distance: Single-Channel jacking distance 318 meters
Geology: Full-Section limestone
Project Difficulties: Rock hardness exceeds 120 MPa, the difference between the launching shaft and the receiving shaft is 1.5 meters, and the long distance through the top of the mountain makes the construction difficult.
![]() |
![]() |
"Huanbei Guangxi No. 8 (Shield Tunneling)" Hard Rock Shield TBM Successfully Launched
Jinan Metropolitan Circle Expressway West Ring Pipe Jacking Project Successfully Launched
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
sales@tangxing.cn
086-5542796608