2022-03-25
operation department
Date: October 14th, 2021
Location: Quzhou, Zhejiang
Project Name: Quzhou Shuangye Line Water Supply Temporary Guarantee Project
Equipment: 1200 rock MTBM
Geology: strongly weathered sandstone
Total Length:186 meters
Difficulity: complex geology, sticky mud
![]() |
![]() |
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
A Perfect Breakthrough for Xidian Binhaixi River Box Culvert Jacking Project Across Shenhai Expressway
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine