TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2022-03-25
operation department
Equipment: 2m rock MTBM
Location: Taizhou, Zhejiang Province
Date: September, 2021
Features: high rock hardness, long jacking distance, difficult construction
Significance: The project is a double-pipe parallel, using a 2m rock MTBM. The total length of jacking distance is 660 meters, and the maximum rock hardness is 173 MPa. It is the first case in Taizhou City and is also a key livelihood project in the province and city.
![]() |
![]() |
The Rectangular Pipe Jacking Machine of Nanchang Rail Transit Project Launched Smoothly
The Zhaoshi River Pipe Jacking Tunnel Crossing Project in the Sixth Bid Section of the Middle Section of the West-East Gas Transmission Line 3 Launched Smoothly
Bengbu Long-distance Pipe Jacking Project Started Smoothly
sales@tangxing.cn
086-5542796608