TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2022-03-25
operation department
Equipment: 3m rock MTBM
Location: Fuzhou, Fujian
Date: October, 2021
Features: crossing complex roads, high settlement required
Significance: The total length is 1350 meters and the 3-meter rock pipe jacking machine is used, and the crossing roads are relatively complicated. The completion of this project is conducive to promoting the pace of Fuzhou's modern and livable city.
![]() |
![]() |
![]() |
![]() |
Successful Breakthrough of the Second Water Treatment Plant Relocation Project (First Section) in Wanan County, Jiangxi
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
A Perfect Breakthrough for Xidian Binhaixi River Box Culvert Jacking Project Across Shenhai Expressway
sales@tangxing.cn
086-5542796608