2016-03-12
Operation Department
Date: March 12th, 2016
Project Name: Northwest Liaoning Pipeline Project
Pipe Diameter: 4000mm
Pipe: reinforced concrete pipe
Soil Condition: gravel
Successful Breakthrough of the Second Water Treatment Plant Relocation Project (First Section) in Wanan County, Jiangxi
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
A Perfect Breakthrough for Xidian Binhaixi River Box Culvert Jacking Project Across Shenhai Expressway