TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2016-03-12
Operation Department
Date: March 12th, 2016
Project Name: Northwest Liaoning Pipeline Project
Pipe Diameter: 4000mm
Pipe: reinforced concrete pipe
Soil Condition: gravel
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
A Perfect Breakthrough for Xidian Binhaixi River Box Culvert Jacking Project Across Shenhai Expressway
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
sales@tangxing.cn
086-5542796608