2014-05-14
operation department
Date: May, 2014
Project Name: Beijing Drain Gas Blanking Project
Pipe Diameter: 1800mm
Pipe: reinforced concrete pipe
Length: 250 meters
soil Condition: clay
Challenges: The current situation is constructing on the road, the environment is complicated, and the site is narrow
![]() |
![]() |
![]() |
![]() |
The Rock Pipe Jacking Machine for the Expansion and Reconstruction Project of the Main Sewage Pipe in the South of Changsha Economic and Technological Development Zone Launched Smoothly
A Perfect Breakthrough for the Pipe Jacking Section of Oil Pipeline Project (Crossing the South-to-North Water Diversion Project)
The Pipe Jacking Machine of the Sewage Pipe Network Renovation and Repair Project in Shushan District, Hefei City Started Smoothly