Project Name: Beijing Drain Gas Blanking Project
Pipe Diameter: 1800mm
Pipe: reinforced concrete pipe
Length: 250 meters
soil Condition: clay
Challenges: The current situation is constructing on the road, the environment is complicated, and the site is narrow
![]() |
![]() |
![]() |
![]() |
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
A Perfect Breakthrough for Xidian Binhaixi River Box Culvert Jacking Project Across Shenhai Expressway
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine