2014-05-14
operation department
Date: May, 2014
Project Name: Beijing Drain Gas Blanking Project
Pipe Diameter: 1800mm
Pipe: reinforced concrete pipe
Length: 250 meters
soil Condition: clay
Challenges: The current situation is constructing on the road, the environment is complicated, and the site is narrow
Bangladesh Chattogram Sewage Treatment Pipe Network Project
Successful Completion of the Han River-Rong River-Lian River Water System Connection Project
The Rock Pipe Jacking Machine of Chengdu Pipeline Connection Project Launched Smoothly