2009-04-17
operation department
Date: April, 2009
Project Name: Beijing-Guangzhou Railway Sewage Pipeline Project
Pipe Diameter: 2000mm
Pipe: reinforced concrete pipe
Length: 108 meters
Soil Condition: silt
Challenges: Crossing railroads and canals
![]() |
![]() |
![]() |
![]() |
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
A Perfect Breakthrough for the First Jacking Section of Ulaanbaatar Water Diversion Project Section in Mongolia
A Perfect Breakthrough for the First Section of Sewage Pipe Network in Moscow, Russia