Project Name: Beijing-Guangzhou Railway Sewage Pipeline Project
Pipe Diameter: 2000mm
Pipe: reinforced concrete pipe
Length: 108 meters
Soil Condition: silt
Challenges: Crossing railroads and canals
![]() |
![]() |
![]() |
![]() |
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
A Perfect Breakthrough for Xidian Binhaixi River Box Culvert Jacking Project Across Shenhai Expressway
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine