2009-04-17
operation department
Date: April, 2009
Project Name: Beijing-Guangzhou Railway Sewage Pipeline Project
Pipe Diameter: 2000mm
Pipe: reinforced concrete pipe
Length: 108 meters
Soil Condition: silt
Challenges: Crossing railroads and canals
![]() |
![]() |
![]() |
![]() |
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
Successful Breakthrough of the Second Water Treatment Plant Relocation Project (First Section) in Wanan County, Jiangxi
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering