TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2016-09-14
operation department
Date: September 14th, 2016
Project Name: Liaoning Dahuofang reservoir water delivery and drought relief emergency project
Pipe Diameter: 3600mm
Pipe: reinforced concrete pipe
Length: 970 meters
Soil Condition: gravel
![]() |
![]() |
![]() |
![]() |
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
Successful Breakthrough of the Second Water Treatment Plant Relocation Project (First Section) in Wanan County, Jiangxi
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
sales@tangxing.cn
086-5542796608