Date: September, 2016
Project Name: Shanghai Huangpu River Drinking Water Project
Pipe Diameter: 3200mm
Pipe: reinforced concrete pipe
Length: 970 meters
Soil Condition: gravel
Challenges: Crossing rivers and canals