TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2016-09-15
operation department
Date: September, 2016
Project Name: Shanghai Huangpu River Drinking Water Project
Pipe Diameter: 3200mm
Pipe: reinforced concrete pipe
Length: 970 meters
Soil Condition: gravel
Challenges: Crossing rivers and canals
![]() |
![]() |
![]() |
![]() |
Jinan Metropolitan Circle Expressway West Ring Pipe Jacking Project Successfully Launched
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
Successful Breakthrough of the Second Water Treatment Plant Relocation Project (First Section) in Wanan County, Jiangxi
sales@tangxing.cn
086-5542796608