2016-10-15
operation department
Project Time: October 13th , 2016
Project Name: Xi'an Municipal Sewage Pipeline Project
Pipe diameter: 3500mm
Pipe Material: Reinforced concrete pipe
Geological Condition: gravel soil
![]() |
![]() |
The Rock Pipe Jacking Machine for the Expansion and Reconstruction Project of the Main Sewage Pipe in the South of Changsha Economic and Technological Development Zone Launched Smoothly
A Perfect Breakthrough for the Pipe Jacking Section of Oil Pipeline Project (Crossing the South-to-North Water Diversion Project)
The Pipe Jacking Machine of the Sewage Pipe Network Renovation and Repair Project in Shushan District, Hefei City Started Smoothly