2016-10-15
operation department
Project Time: October 13th , 2016
Project Name: Xi'an Municipal Sewage Pipeline Project
Pipe diameter: 3500mm
Pipe Material: Reinforced concrete pipe
Geological Condition: gravel soil
Bangladesh Chattogram Sewage Treatment Pipe Network Project
Successful Completion of the Han River-Rong River-Lian River Water System Connection Project
The Rock Pipe Jacking Machine of Chengdu Pipeline Connection Project Launched Smoothly