TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2024-11-22
Operation Department
Date: October 2024
Location: Xuancheng
Project Name: Anhui Province Gangkouwan Reservoir Irrigated Area Project
Project Type: Reservoir Irrigated Area Project
Equipment Details: Tangxing Technology HRC2200 rock pipe jacking machine
Geology: The geology is clay, and there may be small pebbles
Jacking Distance: 290 meters for the first jacking, 495 meters for the second jacking
Project Difficulties: long jacking distance, complex geology, and abundant groundwater
Project Significance: After the completion of the Gangkouwan Reservoir Irrigated Area Project, the irrigated area will reach 523,000 mu, which will become one of the large irrigated areas in southern Anhui. It is of great significance to further rationally allocate water resources, increase grain output and agricultural comprehensive production capacity in irrigated areas, improve water supply conditions in some towns, and accelerate the construction of harmonious and beautiful villages.
![]() |
![]() |
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
A Perfect Breakthrough for the First Jacking Section of Ulaanbaatar Water Diversion Project Section in Mongolia
A Perfect Breakthrough for the First Section of Sewage Pipe Network in Moscow, Russia
sales@tangxing.cn
086-5542796608