2024-11-22
Operation Department
Date: October 2024
Location: Xuancheng
Project Name: Anhui Province Gangkouwan Reservoir Irrigated Area Project
Project Type: Reservoir Irrigated Area Project
Equipment Details: Tangxing Technology HRC2200 rock pipe jacking machine
Geology: The geology is clay, and there may be small pebbles
Jacking Distance: 290 meters for the first jacking, 495 meters for the second jacking
Project Difficulties: long jacking distance, complex geology, and abundant groundwater
Project Significance: After the completion of the Gangkouwan Reservoir Irrigated Area Project, the irrigated area will reach 523,000 mu, which will become one of the large irrigated areas in southern Anhui. It is of great significance to further rationally allocate water resources, increase grain output and agricultural comprehensive production capacity in irrigated areas, improve water supply conditions in some towns, and accelerate the construction of harmonious and beautiful villages.
![]() |
![]() |
"Huanbei Guangxi No. 8 (Shield Tunneling)" Hard Rock Shield TBM Successfully Launched
Jinan Metropolitan Circle Expressway West Ring Pipe Jacking Project Successfully Launched
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
sales@tangxing.cn
086-5542796608