TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2024-11-13
Operation Department
Date: November 2024
Construction Location: Changchun, Jilin
Project Name: Rectangular pipe jacking project of transfer channel 1 and 2 of Fuzhi West Station on Line 6 of Changchun Metro
Project Type: Metro Tunnel
Equipment Details: Tangxing Technology rectangular pipe jacking machine
Geology: medium-coarse sand, weathered mudstone
Jacking Distance: 60 meters
Project Difficulties: large jacking section, settlement control, downhill jacking, complex geology
Project Significance: Assist the construction of transfer channel 1 and 2 of Fuzhi West Station on Line 6 of Changchun Metro.
![]() |
![]() |
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
A Perfect Breakthrough for the First Jacking Section of Ulaanbaatar Water Diversion Project Section in Mongolia
A Perfect Breakthrough for the First Section of Sewage Pipe Network in Moscow, Russia
sales@tangxing.cn
086-5542796608