Date: November 2024
Construction Location: Hefei, Anhui
Project Name: Longgang Road (Taohuatan Road to Nanfei River Road) Road and Integrated Pipeline Corridor Project
Project Type: Integrated pipeline corridor project
Equipment Details: Tangxing Technology Earth Pressure Balance Rectangular Pipe Jacking Machine
Geology: Clay, fine sand formation
Jacking Distance: 370 meters through the river
Project Difficulties: The project poses several challenges, including the large jacking cross-section, long distance, riverbed settlement control, and jacking through challenging soil conditions.
Project Significance: Once completed, the Longgang Road integrated pipeline corridor project will play a vital role in enhancing the regional image of Hefei's new eastern center and advancing Hefei's urban development.
The Pipe Jacking Section of Railway Project of "Wangjia Dajing" Water Source Emergency Replacement Project Was Completed
The Successful Completion of Wenzhou Oujiang River Water Diversion Projec
Anhui Province Gangkouwan Reservoir Irrigated Area Project Launched
sales@tangxing.cn
086-5542796608