Date: November 2024
Construction Location: Hefei, Anhui
Project Name: Longgang Road (Taohuatan Road to Nanfei River Road) Road and Integrated Pipeline Corridor Project
Project Type: Integrated pipeline corridor project
Equipment Details: Tangxing Technology Earth Pressure Balance Rectangular Pipe Jacking Machine
Geology: Clay, fine sand formation
Jacking Distance: 370 meters through the river
Project Difficulties: The project poses several challenges, including the large jacking cross-section, long distance, riverbed settlement control, and jacking through challenging soil conditions.
Project Significance: Once completed, the Longgang Road integrated pipeline corridor project will play a vital role in enhancing the regional image of Hefei's new eastern center and advancing Hefei's urban development.
![]() |
![]() |
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
A Perfect Breakthrough for the First Jacking Section of Ulaanbaatar Water Diversion Project Section in Mongolia
A Perfect Breakthrough for the First Section of Sewage Pipe Network in Moscow, Russia
sales@tangxing.cn
086-5542796608