Date: April 2021
Project Name: Binhai LNG
Pipe Diameter: 1800mm
Soil Condition: quicksand mixed with silt, large groundwater, sea water
Significance: CNPC Binhai LNG natural gas pipeline steel pipes are laid in place, and cement pipe casing jacking pipes are urgently needed to penetrate the nodes to ensure the entire gas pipeline cycle. Other company’s equipment was locked at 50 meters in the first section. At 100 meters in the third section, the cutter head was pulled out due to excessive jacking force.
The Pipe Jacking Section of Railway Project of "Wangjia Dajing" Water Source Emergency Replacement Project Was Completed
The Successful Completion of Wenzhou Oujiang River Water Diversion Projec
Anhui Province Gangkouwan Reservoir Irrigated Area Project Launched