TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2021-08-10
operation department
Date: April 2021
Project Name: Binhai LNG
Pipe Diameter: 1800mm
Soil Condition: quicksand mixed with silt, large groundwater, sea water
Significance: CNPC Binhai LNG natural gas pipeline steel pipes are laid in place, and cement pipe casing jacking pipes are urgently needed to penetrate the nodes to ensure the entire gas pipeline cycle. Other company’s equipment was locked at 50 meters in the first section. At 100 meters in the third section, the cutter head was pulled out due to excessive jacking force.
Bangladesh Chattogram Sewage Treatment Pipe Network Project
Successful Completion of the Han River-Rong River-Lian River Water System Connection Project
The Rock Pipe Jacking Machine of Chengdu Pipeline Connection Project Launched Smoothly
sales@tangxing.cn
086-5542796608