Guangzhou Baiyun 5th Ave.

  • 2019-08-21

  • h

Project Name:Guangzhou Baiyun 5th Ave. Pipe Jacking Project

Project Location:Longgui, Guangzhou

Total Length of the Project:1200 meters

Geological Condition: Mudstone

Construction Challenge: Complex ground condition, interlaced with rocks and silt

Equipment Model: Slurry balance composite cutter pipe jacking machine

Equipment Production dateMay 2019

 