Project Name:Guangzhou Baiyun 5th Ave. Pipe Jacking Project
Project Location:Longgui, Guangzhou
Total Length of the Project:1200 meters
Geological Condition: Mudstone
Construction Challenge: Complex ground condition, interlaced with rocks and silt
Equipment Model: Slurry balance composite cutter pipe jacking machine
Equipment Production date:May 2019

Successful Launch of Pipe Jacking Between Shaft No. 8 and Shaft No. 7 of the Huanbei Guangdong Project (Section D4)
The 1,148-meter Pipe Jacking Section of the Foshan Xuda Power Tunnel Project Has Been Successfully Completed
"Huanbei Guangxi No. 8 (Shield Tunneling)" Hard Rock Shield TBM Successfully Launched