TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2019-08-21
h
Project Name:Guangzhou Baiyun 5th Ave. Pipe Jacking Project
Project Location:Longgui, Guangzhou
Total Length of the Project:1200 meters
Geological Condition: Mudstone
Construction Challenge: Complex ground condition, interlaced with rocks and silt
Equipment Model: Slurry balance composite cutter pipe jacking machine
Equipment Production date:May 2019
The 1,148-meter Pipe Jacking Section of the Foshan Xuda Power Tunnel Project Has Been Successfully Completed
"Huanbei Guangxi No. 8 (Shield Tunneling)" Hard Rock Shield TBM Successfully Launched
Jinan Metropolitan Circle Expressway West Ring Pipe Jacking Project Successfully Launched
sales@tangxing.cn
086-5542796608