Project Name:Guangzhou Baiyun 5th Ave. Pipe Jacking Project
Project Location:Longgui, Guangzhou
Total Length of the Project:1200 meters
Geological Condition: Mudstone
Construction Challenge: Complex ground condition, interlaced with rocks and silt
Equipment Model: Slurry balance composite cutter pipe jacking machine
Equipment Production date:May 2019
Bangladesh Chattogram Sewage Treatment Pipe Network Project
Successful Completion of the Han River-Rong River-Lian River Water System Connection Project
The Rock Pipe Jacking Machine of Chengdu Pipeline Connection Project Launched Smoothly