2019-03-15
operation department
Project Name:Yangtze Revier and Shahu Lake Water Environment Improvement Project
Project Location:Wuchang District, Wuhan, Hubei Province
Total Length of the Project:5.439 km
Geological Condition: Silty clay
Construction Feature and Challenge:
1.Sharp curve pipe Jacking
2.Long distance pipe jacking
3.Underwater pipe jacking
4.Large diameter pipe jacking
The radius of curvature is only 600m, which is smaller than the outer diameter of the pipe. The jacking axis is not easy to accurately control, and it is easy to deviate from the design axis. In addition, the curve section is long, and the internal visibility of the pipeline is not good, which makes the jacking construction measurement difficult. The longer the pipe jacking distance is, the more difficult the construction techniques such as grouting drag reduction, relay ability, power supply in the tunnel, and underground transportation will be.
Equipment model and features:
Φ 3500 slurry, large pipe diameter, long jacking distance
![]() |
![]() |
![]() |
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
Successful Breakthrough of the Second Water Treatment Plant Relocation Project (First Section) in Wanan County, Jiangxi
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
sales@tangxing.cn
086-5542796608