Date: August 2025
Construction Location: Jinan City, Shandong Province
Project Name: Jinan Metropolitan Circle Expressway West Ring Pipe Jacking Project
Project Type: Transportation Infrastructure Project
Equipment Details: Tangxing Technology SPB2800mm Slurry Balance Pipe Jacking Machine
Jacking Distance: Single jacking distance of 174 meters
Geology: Yellow River alluvial soil
Project Challenges: High groundwater level, poor self-stability, long jacking distance, requiring extremely timely and precise steering adjustments.
Project Significance: The Jinan Western Ring is a key western section of the Jinan Metropolitan Circle Expressway. Its opening effectively alleviates the traffic pressure on the existing ring expressway, expands Jinan's coverage area, strengthens connections with surrounding cities such as Dezhou and Liaocheng, promotes regional economic integration, smooth logistics, and tourism resource development, and provides strong transportation support for the Shandong provincial capital economic circle and the "strong provincial capital" strategy.
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
Successful Breakthrough of the Second Water Treatment Plant Relocation Project (First Section) in Wanan County, Jiangxi
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
sales@tangxing.cn
086-5542796608