TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2025-03-21
Operation Department
Date: February 2025
Construction location: Wuxue City, Hubei Province
Project name: Dajin Liuyuan Connection Project
Project type: Water Diversion Project
Equipment details: Tangxing Technology HRC2000 rock pipe jacking machine
Jacking distance: 1266 meters
Project difficulty: Crossing the mountain, long-distance excavation
Project significance: After the project is completed, it will inject scientific and technological momentum into the 610,000 mu farmland irrigation system in Wuxue City.
![]() |
![]() |
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
A Perfect Breakthrough for Xidian Binhaixi River Box Culvert Jacking Project Across Shenhai Expressway
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
sales@tangxing.cn
086-5542796608