Date: March 2024
Location: Chengdu City
Project Name: Chengdu Pipeline Connection Project
Project Type: Communication Engineering
Equipment Details: Tangxing Equipment HRC 3000mm rock pipe jacking machine
Geology: Mudstone
Jacking Distance: The jacking section is 217 meters and the entire project has multiple jacking sections
Difficulties: complex geological conditions, multiple jacking sections
Significance: Once completed, the project will be of great significance in ensuring the safe operation of "urban lifelines" such as power and communications in Tianfu New District, rationally and efficiently utilizing urban resources, improving the scientific and intelligent level of urban management, and achieving high-quality development in the new district.
![]() |
![]() |
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
A Perfect Breakthrough for the First Jacking Section of Ulaanbaatar Water Diversion Project Section in Mongolia
A Perfect Breakthrough for the First Section of Sewage Pipe Network in Moscow, Russia
sales@tangxing.cn
086-5542796608