TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2023-11-01
Operation Department
Date: October 2023
Location: Bengbu City
Project Name: Guzhen County Urban and Rural Water Supply Integration and Flood Control Project
Project Type: Water Supply Pipeline Network Project
Equipment: Tangxing Technology HRC2000mm rock pipe jacking machine
Geology: Rock
Jacking Distance: 1101.38 meters
Engineering Difficulties : Crossing the Xie River and fish ponds multiple times, the pipe jacking depth is about 13 meters, and the jacking distance is as long as 1101.38 meters. It is currently the longest pipe jacking project in a single section in Bengbu City.
Significance: After completion of the project, it will promote the construction of water ecology, water environment, and water culture in Guzhen County, and create high-quality ecological corridors such as the demonstration section of the Hui River, the Sanba River, and the Beicheng District Landscape River.
Successful Completion of the Han River-Rong River-Lian River Water System Connection Project
The Rock Pipe Jacking Machine of Chengdu Pipeline Connection Project Launched Smoothly
A Perfect Breakthrough for the Chengnan Water Plant Renovation and Expansion Project in Lichuan County
sales@tangxing.cn
086-5542796608