TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2023-07-03
Operation Department
Date: June 2023
Location: Jiangxi Province
Project Name: The Pipe Jacking Project of Chengnan Water Plant Reconstruction and Expansion Project
Project Type: Water Supply Project
Equipment: Tangxing Equipment HRC 1200mm hard rock pipe jacking machine
Geology: Granite
Jacking Distance: 700 meters
Difficulties: High rock hardness, crossing mountains, long jacking distance, narrow construction site, etc.
Significance: After the completion of the project, it will benefit a large number of people in the county and the towns along the pipeline, and improve the water consumption of residents. It is a livelihood project for the people and plays an important role in the water supply of Lichuan County.
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering
A Perfect Breakthrough for Xidian Binhaixi River Box Culvert Jacking Project Across Shenhai Expressway
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
sales@tangxing.cn
086-5542796608