2022-08-12
operation department
Date: July 2022
Location: Jinan City, Shandong Province
Equipment: Tangxing SPB2600mm slurry balance pipe jacking machine
Type: Power engineering
Geology: Soft soil
Jacking Distance: 280 meters
Difficulties: the total jacking distance is more than 1,000 meters, and the project is divided into multiple jacking sections, complex geology
Significance: After the project is completed, it will produce great social benefits and further improve the local infrastructure construction.
![]() |
![]() |
![]() |
![]() |
“Rongyuan” Hard Rock Jacking and Tunnelling Machine Successfully Launched
A Perfect Breakthrough for "Zhoushui" TBM
Tangxing Technology HRC2800mm Rock Pipe Jacking Machine Successfully Completes Key Section of Foshan Cable Duct Project