2022-02-09
operation department
Location: Hangzhou, Zhejiang
Date: January 2022
Equipment: SPBΦ4000 slurry balance pipe jacking machine
Jacking Distance: 516 meters
Type: Power Engineering
Features: Hyperbolic pipe jacking project
Bangladesh Chattogram Sewage Treatment Pipe Network Project
Successful Completion of the Han River-Rong River-Lian River Water System Connection Project
The Rock Pipe Jacking Machine of Chengdu Pipeline Connection Project Launched Smoothly