2022-04-22
operation department
Date: December 2021
Location: Shenzhen
Project Name: Pearl River Delta Water Resources Allocation Project
Equipment: 3000 rock MTBM
Geology: Sandy clay, fully weathered granite, moderately weathered granite
Jacking Distance: 562 meters
Difficulties: Crossing the Pearl River Delta, the jacking distance is long, and the construction is difficult
Significance: It aims to optimize the allocation of water resources in the Pearl River Delta. After the completion of the project, the beneficiary population will exceed 50 million, which will effectively solve the local water shortage problem, effectively change the single water supply pattern, and improve the city's water supply security and emergency support capabilities.
![]() |
![]() |
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
Successful Breakthrough of the Second Water Treatment Plant Relocation Project (First Section) in Wanan County, Jiangxi
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering