TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2022-04-22
operation department
Date: December 2021
Location: Shenzhen
Project Name: Pearl River Delta Water Resources Allocation Project
Equipment: 3000 rock MTBM
Geology: Sandy clay, fully weathered granite, moderately weathered granite
Jacking Distance: 562 meters
Difficulties: Crossing the Pearl River Delta, the jacking distance is long, and the construction is difficult
Significance: It aims to optimize the allocation of water resources in the Pearl River Delta. After the completion of the project, the beneficiary population will exceed 50 million, which will effectively solve the local water shortage problem, effectively change the single water supply pattern, and improve the city's water supply security and emergency support capabilities.
![]() |
![]() |
The Pipe Jacking Section of Railway Project of "Wangjia Dajing" Water Source Emergency Replacement Project Was Completed
The Successful Completion of Wenzhou Oujiang River Water Diversion Projec
Anhui Province Gangkouwan Reservoir Irrigated Area Project Launched
sales@tangxing.cn
086-5542796608