2021-08-30
Operation Department
Date: May 2021
Location: Wuhan, Hubei Province
Equipment: 4.2*5 meters rectangular micro tunnel boring machine
Features: Crossing the rivers, natural gas pipelines, 2.4 meters of overlying soil, complex geology
Significance:The total length of the Huangxiao River Comprehensive cable duct bank is about 5 kilometers. The 90-meter pipe jacking section is constructed by a 4.2m*5m rectangular micro tunnel boring machine. After the project is completed, it can effectively solve the problems such as regional traffic congestion and waterlogging.
The Pipe Jacking Section of Railway Project of "Wangjia Dajing" Water Source Emergency Replacement Project Was Completed
The Successful Completion of Wenzhou Oujiang River Water Diversion Projec
Anhui Province Gangkouwan Reservoir Irrigated Area Project Launched