TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2021-08-30
Operation Department
Date: May 2021
Location: Wuhan, Hubei Province
Equipment: 4.2*5 meters rectangular micro tunnel boring machine
Features: Crossing the rivers, natural gas pipelines, 2.4 meters of overlying soil, complex geology
Significance:The total length of the Huangxiao River Comprehensive cable duct bank is about 5 kilometers. The 90-meter pipe jacking section is constructed by a 4.2m*5m rectangular micro tunnel boring machine. After the project is completed, it can effectively solve the problems such as regional traffic congestion and waterlogging.
![]() |
![]() |
![]() |
![]() |
The 1,148-meter Pipe Jacking Section of the Foshan Xuda Power Tunnel Project Has Been Successfully Completed
"Huanbei Guangxi No. 8 (Shield Tunneling)" Hard Rock Shield TBM Successfully Launched
Jinan Metropolitan Circle Expressway West Ring Pipe Jacking Project Successfully Launched







sales@tangxing.cn
086-5542796608