2024-05-31
Operation Department
Date: May 2024
Location: Chattogram, Bangladesh
Project Name: Bangladesh Chattogram Sewage Treatment Pipe Network Project
Project Type: Sewage pipe network project
Equipment: Tangxing Equipment SPB 1900mm slurry balance pipe jacking machine
Geology: Silty sand
Jacking Distance: There are three sections in total, with a total project length of 20-30 kilometers
Project Difficulty: The equipment needs to breakthrough the quicksand formation during jacking, which puts extremely high demands on the performance of the pipe jacking machine
Project Significance: The completion of this project will have a positive impact on the improvement of local sewage treatment capacity, the water quality safety, the infrastructure construction, the economic development, and the ecosystem quality.
![]() |
![]() |
Jinan Metropolitan Circle Expressway West Ring Pipe Jacking Project Successfully Launched
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
Successful Breakthrough of the Second Water Treatment Plant Relocation Project (First Section) in Wanan County, Jiangxi
sales@tangxing.cn
086-5542796608