TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2024-05-31
Operation Department
Date: May 2024
Location: Chattogram, Bangladesh
Project Name: Bangladesh Chattogram Sewage Treatment Pipe Network Project
Project Type: Sewage pipe network project
Equipment: Tangxing Equipment SPB 1900mm slurry balance pipe jacking machine
Geology: Silty sand
Jacking Distance: There are three sections in total, with a total project length of 20-30 kilometers
Project Difficulty: The equipment needs to breakthrough the quicksand formation during jacking, which puts extremely high demands on the performance of the pipe jacking machine
Project Significance: The completion of this project will have a positive impact on the improvement of local sewage treatment capacity, the water quality safety, the infrastructure construction, the economic development, and the ecosystem quality.
![]() |
![]() |
The 1,148-meter Pipe Jacking Section of the Foshan Xuda Power Tunnel Project Has Been Successfully Completed
"Huanbei Guangxi No. 8 (Shield Tunneling)" Hard Rock Shield TBM Successfully Launched
Jinan Metropolitan Circle Expressway West Ring Pipe Jacking Project Successfully Launched







sales@tangxing.cn
086-5542796608