TBM
Shield TBM
Hard Rock
Slurry Balance
Earth Balance
Rectangular
Auger Boring
Microtunnelling Machine
Others
2024-05-31
Operation Department
Date: May 2024
Location: Chattogram, Bangladesh
Project Name: Bangladesh Chattogram Sewage Treatment Pipe Network Project
Project Type: Sewage pipe network project
Equipment: Tangxing Equipment SPB 1900mm slurry balance pipe jacking machine
Geology: Silty sand
Jacking Distance: There are three sections in total, with a total project length of 20-30 kilometers
Project Difficulty: The equipment needs to breakthrough the quicksand formation during jacking, which puts extremely high demands on the performance of the pipe jacking machine
Project Significance: The completion of this project will have a positive impact on the improvement of local sewage treatment capacity, the water quality safety, the infrastructure construction, the economic development, and the ecosystem quality.
![]() |
![]() |
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
A Perfect Breakthrough for the First Jacking Section of Ulaanbaatar Water Diversion Project Section in Mongolia
A Perfect Breakthrough for the First Section of Sewage Pipe Network in Moscow, Russia
sales@tangxing.cn
086-5542796608