2022-07-14
operation department
Date: June 2022
Location: Beijing
Equipment: Tangxing EPB 1550mm earth pressure balance pipe jacking machine
Type: Natural Gas Engineering
Difficulties: The project was divided into three jacking sections, crossing the national highway, and the geology was complex
Significance: National Highway 104 (The Fifth Ring Expressway-Qingyuan Road) passes through Jiugong Town and Yinghai Town in Daxing District. Its reconstruction will help promote local traffic, facilitate residents' travel, and promote local economic development. The project will simultaneously build electric power, gas, water supply and other pipelines. It will meet the municipal needs of the development of the area along the line.
![]() |
![]() |
Launch of the Pipe Jacking Machine for the Second Phase of the Yangtze River to Huaihe River Water Diversion Project (Water Conservancy Section) Hefei 5th Water Plant Pipeline Project
Successful Breakthrough of the Second Water Treatment Plant Relocation Project (First Section) in Wanan County, Jiangxi
Jinan 2×660,000 kW Advanced Coal-Fired Unit Heating Project Pipeline Engineering