2021-08-30
operation department
Date: April 2021
Location: Huzhou, Zhejiang Province
Equipment: 2600mm rock micro tunnel boring machine
Features: rich ground water, single distance of pipe jacking is 124 meters
Significance:The drinking water project of the two reservoirs in Anji includes newly-built water intakes of the reservoirs, water conveyance tunnels, water conveyance pipelines, etc. The single distance of the pipe jacking section is 124 meters, which is difficult to construct. The equipment is fully prepared for the project.
![]() |
![]() |
![]() |
![]() |
Qingdao Electronic Information Industrial Park Supporting Project Electricity Supporting Project (Phase II)
The Pipe Jacking Section of Railway Project of "Wangjia Dajing" Water Source Emergency Replacement Project Was Completed
The Successful Completion of Wenzhou Oujiang River Water Diversion Projec