operation department
Date: April 2021
Location: Huzhou, Zhejiang Province
Equipment: 2600mm rock micro tunnel boring machine
Features: rich ground water, single distance of pipe jacking is 124 meters
Significance:The drinking water project of the two reservoirs in Anji includes newly-built water intakes of the reservoirs, water conveyance tunnels, water conveyance pipelines, etc. The single distance of the pipe jacking section is 124 meters, which is difficult to construct. The equipment is fully prepared for the project.
![]() |
![]() |
![]() |
![]() |
A Perfect Breakthrough for “Jiaolong No.2” Hard Rock Pipe Jacking Machine
A Perfect Breakthrough for the First Jacking Section of Ulaanbaatar Water Diversion Project Section in Mongolia
A Perfect Breakthrough for the First Section of Sewage Pipe Network in Moscow, Russia