China-Russia Oil Project

  • 2019-11-22

  • operation department

Tangxing Pipe Jacking Machine Contributed In China-Russia Oil Pipeline Project in Moergen


 

The 2200 slurry balance rock pipe jacking machine is designed with front and rear water supply systems, which can keep the excavation chamber clean and avoid adhesion, and optimize the flow of slag. And it is optimized on the basis of the rock micro-tunneling machine to equip it with a cutter head that matches the specific ground conditions. Standard cutter heads can be used for composite formations such as soil layers and gravel; for tunneling to stabilize surrounding rock, hard rock cutter-heads with replacement hobs can be used. Therefore, this type of model can be applied to most geology.


      


 

 

Submit your requirements quickly in 30 seconds, and
customize your industry-specific solutions online
Name
Contact Information
Leave a Message
Submit Now
Service Hotline
086-5542796608

sales@tangxing.cn

086-5542796608